ON-SITE TESTING OF MASONRY SHEAR WALLS STRENGTHENED WITH TIMBER PANELS

ON-SITE TESTING OF MASONRY SHEAR WALLS STRENGTHENED WITH TIMBER PANELS

Proceedings of the Institution of Civil Engineers – Structures and Buildings (2020)

The use of timber-based panels connected to the masonry walls via mechanical fasteners was investigated to strengthen or repair unreinforced masonry (URM). Testing consisted of in-plane semi-cyclic quasi-static loading applied to as-built, repaired and retrofitted configurations.

Read More
Guest User
MECHANICAL ANCHOR SUPPLEMENTARY SHEAR REINFORCING AS A RETROFIT TECHNIQUE FOR HOLLOWCORE FLOORS

MECHANICAL ANCHOR SUPPLEMENTARY SHEAR REINFORCING AS A RETROFIT TECHNIQUE FOR HOLLOWCORE FLOORS

New Zealand Society for Earthquake Engineering Conference (2022)

Two full-scale, three-point bending shear tests and FEA analysis were conducted to assess the impact on hollowcore floor unit (aka dycore) shear performance of post-installed PYTHON HC supplementary shear reinforcement.

Read More
Guest User
CONSTRUCTION DETAILS AND OBSERVED EARTHQUAKE PERFORMANCE OF UNREINFORCED CLAY BRICK MASONRY CAVITY-WALLS

CONSTRUCTION DETAILS AND OBSERVED EARTHQUAKE PERFORMANCE OF UNREINFORCED CLAY BRICK MASONRY CAVITY-WALLS

Structures (2016), 6, 159–169

Two hundred and fifty-two cavity-walls damaged during the 2010/2011 Canterbury earthquakes were assessed to define the most commonly encountered construction details and identify typical deficiencies in earthquake response to address with appropriate retrofit solutions.

Read More
Guest User
EFFECTIVE SEISMIC RETROFIT OF URM PARAPETS USING ANCHORS AS VERTICAL REINFORCEMENT

EFFECTIVE SEISMIC RETROFIT OF URM PARAPETS USING ANCHORS AS VERTICAL REINFORCEMENT

Earthquake Spectra (2026), 42 (2)

Seismic retrofit of unreinforced masonry (URM) parapets can provide enhanced seismic performance and collapse prevention. While widely adopted retrofit methods (e.g., braced systems) have been shown to be effective, they often require trade-offs in the form of high installation and fabrication costs, risk of water ingress due to roof penetrations, and disturbance of historical aesthetic.

Read More
Guest User